Tokyo Power Corporation Business Introduction
Leave the design and installation of power plant equipment and facilities to us!
At Tokyo Power Corporation, we construct turbines, generators, boilers, and even auxiliary equipment, which are the main facilities of power plants. In the case of new installations, the construction period for a turbine generator and boiler system with a capacity of 1 million kW is approximately 1 to 3 years. Additionally, all machinery is from top manufacturers, and we collaborate with their engineers to carry out assembly, installation, and trial operation on-site. We have acquired specialized and extensive skills to install and maintain not only electrical equipment but also all types of facility equipment. 【Business Items】 ■ Design and installation work for various power plant equipment and facilities ■ Design and installation work for various machinery and ancillary equipment ■ Design and construction of various piping ■ Worker dispatch services ■ All operations incidental to the above *For more details, please download the PDF or feel free to contact us.
- Company:東京動力 本社
- Price:Other